Higby (Ashby Arts)

Higby is a 5-story residential building located at 3015 San Pablo in Berkeley.  The building features 98 apartments with 6,500sf of restaurant and retail space.  BMC provided complete installations of the Plumbing and HVAC systems including sanitary waste and vent, storm water collection, natural gas distribution, domestic hot water, domestic cold water, fuel oil, landscape and irrigation supply, electrical heat system, garage exhaust and an underslab drainage system.

  • Architect

    MBH Architects

  • Certification

    LEED Gold (Anticipated)

  • Completion

    2015

  • Contractor

    Balfour Beatty Construction

  • Location

    Berkeley

  • Owner

    Gerding Edlen

Let’s Build
Together