BMC was contracted to perform an energy upgrade for City of Oakland’s Hall of Justice. The energy retrofit replaced the existing cooling tower that served the Hall of Justice with a high efficiency cooling tower while including a temporary cooling for the generators when the cooling tower was inoperable. As part of the project, BMC provided complete installation of isolation dampers, a variable frequency drive (VFD) and changed from nomadic to DDC controls on the supply fan serving the cooling tower.